Keithley 7020D

Keithley Digital Input Board. Voltage: 42V peak, Voltage: internally supplied at 5.3V, Current: 65mA.

Model
Keithley 7020D
Calibration
Available on request
Price
$550
Status
In stock
RFQ ref
7020D
View cart
Prefer to talk? Call +1 (484) 841-9341

This unit

The Keithley 7020-D is an 80-bit digital I/O interface card delivering 40 independent inputs and 40 independent outputs for high-density signal monitoring and control in automated test systems. Two heavy-duty 50-pin D-sub connectors via short cables provide solid mechanical connection suitable for production environments with frequent connect/disconnect cycles. Open-collector output drivers with integrated flyback diodes, factory-installed 10kΩ pull-up resistors, and flexible voltage configuration support demanding industrial and ATE applications.

Technical Specifications Digital I/O Architecture

40 independent digital inputs with internal 10kΩ pull-up resistors

40 independent digital outputs configured as open-collector drivers

Input logic levels: 0.8V maximum (low), 2V minimum (high)

Maximum input voltage: 42V peak Output Driver Characteristics

Pull-up voltage: internally supplied at 5.3V; external connection accepts user-supplied voltage to 25V maximum

Internal 10kΩ pull-up resistors; removable for external pull-up devices

Positive Temperature Coefficient (PTC) circuit protector in series with each output

Per-channel maximum sink current: 65mA

Per-bank (8-bit) maximum sink current: 500mA

Per-card maximum sink current: 1A

Output protection resistance: <18Ω

Collector-emitter saturation voltage: <0.75V @ 1mA, <1V @ 65mA Input Specifications

Input logic low current: −600µA maximum @ 0V

Input logic high current: 50µA maximum @ 5V Power Supply

Internal 5.3V supply or external user-supplied voltage option

Key Features

Two 50-pin D-sub connectors with short cable assemblies for reliable industrial interconnection

Internal flyback diode protection on all output drivers

Jumper-selectable dual pull-up voltage support

Integrated input and output protection

Compact high-density implementation

Typical Applications

Automated test equipment (ATE) with extensive digital control and monitoring

Production line relay and solenoid control

Industrial process monitoring with parallel signal acquisition

Large-scale digital switching and sequencing

Compatibility & Integration The 7020-D integrates into test systems requiring high-channel-count digital I/O in a single card slot. D-sub connector configuration optimizes for production environments where mechanical durability and frequent cable handling are operational requirements.

Specifications

ParameterValue
Voltage / Current Range1A per card, 5.3V internal, 500mA per bank, external to 25V max

Keithley 7020D — Repair & Calibration Service

Aumictech offers NIST-traceable calibration and repair for the Keithley 7020D. Calibration covers per-channel threshold accuracy, input leakage current, logic level high/low margins, and signal timing verification. All calibrations ship with a NIST-traceable certificate. Turnaround is typically 1–3 business days after receipt.

Standard Cal
$450
Pass/fail cert + NIST sticker
Cal with Data
$650
Full NIST cert with measured values

Common Keithley 7020D faults: ESD-damaged input protection, failed driver ICs, connector pin damage. Most failures involve ESD-damaged input protection circuitry, failed logic driver ICs, or mechanical connector pin damage. Board-level component replacement is standard practice.

Keithley 7020D price

This Keithley 7020D is listed at $550. Calibration is available separately from $450. Contact us for volume pricing or if you need multiple units.

Keithley 7020D calibration cost

NIST-traceable calibration for the Keithley 7020D is $450 (standard — pass/fail certificate and calibration sticker) or $650 (full measured data at every test point, reference standards documented, traceability chain included). Calibration for this instrument covers per-channel threshold accuracy, input leakage current, logic level high/low margins, and signal timing verification. Turnaround is 1 to 3 business days after receipt. See full calibration details →

Documents